One of our NorCal project teams wrapped up a Geoform-ER (Extended Release) Slurry Direct Push Injection project in Santa Clara County.


ree

ree



We utilized a Geoprobe 7822 Direct Push Rig to advance our direct push slurry injection tools to the target treatment interval between 30 and 42 feet.







ree




The Geoform-ER reagent, supplied by Evonik, was stored onsite in a portable container for secure and easy access.








ree


Geoform ER was mixed into a thick 25% slurry mixture. a consistency that resembles wet concrete when mixed. Its density can make mixing and pumping a bit more challenging, but with our equipment we were able to inject it efficiently and effectively. Once injected in the subsurface, its provides long-term treatment.




ree



The team also bioaugmented using KB-1 Microbial Culture and prepared anaerobic mix and flush water using KB-1 Primer, both provided by SiREM Lab. We prepared the anaerobic mix and flush water in a Frac tank we kept on site.






ree



Our self-contained mixing and injection trailer made for a quick, organized, and clean setup, helping the team work efficiently while maintaining a professional, safe worksite.








ree




Another great example of collaboration, planning, and execution coming together to deliver results.








If you have any questions on this project, or if we can help support any of your current or upcoming projects, please contact us.


This post can also be viewed on our company LinkedIn page. Please follow Legacy Remediation on LinkedIn to stay up to date on upcoming events and completed projects.


 
 

Copyright ©202 | Legacy Remediation, Inc.

bottom of page